How to prepare an IT project specification

| | 0 Comments
How to prepare an IT project specification


 

The importance of a well-defined IT project specification

In today’s fast-paced and technology-driven world, businesses rely heavily on information technology (IT) to streamline their operations, enhance productivity, and gain a competitive edge. However, implementing IT projects can be a complex and challenging task, often leading to cost overruns, delays, and unsatisfactory outcomes. One of the key factors that can significantly impact the success of an IT project is a well-defined project specification.

A project specification serves as a blueprint for the entire project, outlining its objectives, scope, deliverables, and requirements. It provides a clear and detailed description of what needs to be accomplished, enabling all stakeholders to have a common understanding of the project’s goals and expectations. Without a well-defined specification, IT projects can easily veer off track, leading to confusion, miscommunication, and ultimately, project failure.

One of the primary benefits of a well-defined IT project specification is that it helps in managing expectations. By clearly defining the project’s scope and deliverables, stakeholders can have a realistic understanding of what can be achieved within the given time frame and budget. This helps in avoiding scope creep, where additional requirements are added during the project, leading to delays and increased costs. A well-defined specification sets clear boundaries and ensures that everyone involved is on the same page, reducing the chances of misunderstandings and conflicts.

Furthermore, a well-defined project specification acts as a reference point throughout the project lifecycle. It serves as a guide for the project team, providing them with a roadmap to follow and ensuring that they stay focused on the project’s objectives. It helps in prioritizing tasks, allocating resources effectively, and monitoring progress. Without a clear specification, the project team may lack direction and struggle to make informed decisions, leading to inefficiencies and delays.

Another crucial aspect of a well-defined IT project specification is that it facilitates effective communication. It serves as a common language between the project team, stakeholders, and clients, ensuring that everyone is on the same page. It helps in avoiding misunderstandings, clarifying requirements, and resolving conflicts. A well-defined specification provides a platform for open and transparent communication, fostering collaboration and trust among all parties involved.

Moreover, a well-defined project specification enables accurate estimation of costs and timelines. By clearly defining the project’s requirements and deliverables, it becomes easier to estimate the resources, time, and budget needed to complete the project successfully. This helps in avoiding cost overruns and delays, as well as in making informed decisions regarding resource allocation and project scheduling.

In addition to the above benefits, a well-defined IT project specification also helps in risk management. By identifying potential risks and challenges upfront, the project team can develop strategies to mitigate them effectively. It allows for proactive planning and risk assessment, reducing the chances of unexpected issues derailing the project. A well-defined specification also helps in identifying dependencies and interdependencies, enabling the project team to manage them efficiently.

In conclusion, a well-defined IT project specification plays a crucial role in the success of any IT project. It helps in managing expectations, providing a roadmap for the project team, facilitating effective communication, enabling accurate estimation of costs and timelines, and aiding in risk management. Investing time and effort in developing a comprehensive and well-defined specification upfront can save businesses from costly mistakes, delays, and unsatisfactory outcomes. Therefore, it is essential for organizations to prioritize the development of a well-defined project specification to ensure the successful implementation of their IT projects.

Keywords: IT project specification, well-defined, project success, scope, deliverables, requirements, managing expectations, scope creep, project team, communication, cost estimation, risk management.

Long-tail phrases:
– Importance of a well-defined IT project specification
– Benefits of a well-defined project specification
– Managing expectations in IT projects
– Effective communication in IT projects
– Accurate estimation of costs and timelines in IT projects
– Risk management in IT projects
– Project success through a well-defined specification


 

Best practices for gathering requirements for an IT project specification

1. Identify and involve key stakeholders: The first step in gathering requirements is to identify the key stakeholders who will be affected by the project. This includes end-users, managers, IT staff, and any other individuals or groups who have a vested interest in the project’s outcome. Involving these stakeholders from the beginning ensures that their needs and expectations are considered and helps in avoiding any misunderstandings or conflicts later on.

2. Conduct interviews and workshops: Interviews and workshops are effective ways to gather requirements from stakeholders. Conducting one-on-one interviews allows for a more in-depth understanding of individual needs and preferences, while workshops provide an opportunity for stakeholders to collaborate and share their ideas. These sessions should be well-planned and structured to ensure that all relevant information is captured.

3. Use multiple techniques: Gathering requirements should not rely solely on interviews and workshops. It is important to use a combination of techniques such as surveys, questionnaires, and observations to gather a comprehensive set of requirements. Each technique has its own advantages and limitations, and using multiple techniques helps in validating and cross-verifying the gathered information.

4. Document requirements clearly: Once the requirements are gathered, it is essential to document them clearly and concisely. This includes capturing the functional and non-functional requirements, as well as any constraints or dependencies. The documentation should be organized in a structured manner, using appropriate templates or tools, to ensure that all requirements are captured and can be easily understood by all stakeholders.

5. Prioritize requirements: Not all requirements are of equal importance. It is important to prioritize the requirements based on their criticality and impact on the project’s success. This helps in managing resources effectively and ensures that the most important requirements are addressed first. Prioritization can be done through discussions with stakeholders or by using techniques such as MoSCoW (Must have, Should have, Could have, Won’t have) prioritization.

6. Validate and verify requirements: Once the requirements are documented, it is crucial to validate and verify them with the stakeholders. This involves reviewing the requirements with the stakeholders to ensure that they accurately reflect their needs and expectations. It also helps in identifying any gaps or inconsistencies in the requirements and allows for necessary adjustments or refinements.

7. Involve the development team: Involving the development team in the requirements gathering process is essential for their understanding and buy-in. The development team can provide valuable insights and suggestions based on their technical expertise and experience. Their involvement also helps in ensuring that the requirements are feasible and can be implemented within the project’s constraints.

8. Maintain flexibility: Requirements gathering is an iterative process, and it is important to maintain flexibility throughout. As the project progresses, new requirements may emerge, or existing requirements may need to be modified. It is crucial to have a mechanism in place to handle these changes and ensure that they are properly documented, communicated, and managed.

In conclusion, gathering requirements for an IT project specification is a critical step that requires careful planning and execution. By following these best practices, organizations can ensure that the project’s requirements are accurately captured, understood, and implemented, leading to a successful outcome.

Keywords: requirements gathering, IT project specification, stakeholders, interviews, workshops, techniques, documentation, prioritization, validation, development team, flexibility.

Long-tail phrases: , involving key stakeholders in requirements gathering, conducting interviews and workshops for requirements gathering, using multiple techniques for requirements gathering, documenting requirements clearly, prioritizing requirements, validating and verifying requirements, involving the development team in requirements gathering, maintaining flexibility in requirements gathering process.


 

Techniques for documenting functional requirements in an IT project specification

There are several techniques that can be employed to document functional requirements in an IT project specification. Each technique has its own advantages and can be used in different scenarios, depending on the complexity of the project and the preferences of the stakeholders. Let’s explore some of these techniques:

1. Use Case Diagrams: Use case diagrams are graphical representations that depict the interactions between the system and its users or external systems. They provide a high-level overview of the system’s functionality and help identify the main actors and their roles. Use case diagrams are particularly useful for capturing the system’s behavior from a user’s perspective.

2. User Stories: User stories are concise, informal descriptions of a system’s functionality, written from the perspective of an end user. They typically follow a simple template: “As a [user role], I want [goal] so that [reason].” User stories are often used in Agile methodologies, as they promote collaboration and prioritize customer satisfaction. They are easy to understand and can be used as a basis for creating test cases.

3. Functional Decomposition: Functional decomposition involves breaking down the system’s functionality into smaller, more manageable components. This technique helps identify the main functions and sub-functions of the system, and it allows for a more detailed analysis of the requirements. Functional decomposition can be represented using hierarchical diagrams, such as a functional flowchart or a tree structure.

4. Business Process Modeling: Business process modeling involves creating visual representations of the system’s workflows and processes. This technique helps identify the sequence of activities, the inputs and outputs, and the dependencies between different processes. Business process modeling can be done using various notations, such as BPMN (Business Process Model and Notation) or UML (Unified Modeling Language).

5. Data Flow Diagrams: Data flow diagrams (DFDs) depict the flow of data within a system, showing how inputs are transformed into outputs through various processes. DFDs help identify the data sources, the data transformations, and the data destinations within the system. They are particularly useful for understanding the data requirements and dependencies of the system.

6. Prototyping: Prototyping involves creating a simplified version of the system or a specific feature to gather feedback and validate the requirements. Prototypes can be interactive or static, depending on the project’s needs. They help stakeholders visualize the system’s functionality and provide valuable insights for refining the requirements.

7. Requirements Traceability Matrix: A requirements traceability matrix (RTM) is a document that links the functional requirements to the design, development, and testing activities. It helps ensure that all requirements are addressed and tested, and it provides a clear audit trail for tracking changes and managing scope. An RTM can be created using a spreadsheet or a specialized requirements management tool.

In conclusion, documenting functional requirements in an IT project specification is a critical step in ensuring project success. The techniques mentioned above provide various approaches for capturing and communicating these requirements effectively. By using a combination of these techniques, project teams can create a comprehensive and well-documented specification that serves as a foundation for successful project delivery.

Keywords: functional requirements, IT project, specification, techniques, documenting, use case diagrams, user stories, functional decomposition, business process modeling, data flow diagrams, prototyping, requirements traceability matrix.

Long-tail phrases: , advantages of use case diagrams in documenting functional requirements, benefits of user stories in IT project specifications, importance of functional decomposition in IT project documentation, role of business process modeling in capturing functional requirements, significance of data flow diagrams in documenting IT project specifications, benefits of prototyping in functional requirement documentation, the role of requirements traceability matrix in IT project specifications.


 

Strategies for managing change requests during the development of an IT project specification

1. Establish a Change Control Process:
The first step in managing change requests is to establish a well-defined change control process. This process should outline how change requests will be submitted, evaluated, approved, and implemented. It should also define the roles and responsibilities of the project team members involved in the change control process. By having a clear process in place, the project team can effectively manage change requests without disrupting the project’s progress.

2. Prioritize Change Requests:
Not all change requests are equal in terms of their impact on the project. It is essential to prioritize change requests based on their urgency, importance, and alignment with the project’s objectives. This can be done by evaluating the potential benefits, risks, and costs associated with each change request. By prioritizing change requests, the project team can focus on implementing the most critical changes first, ensuring that the project stays on track.

3. Assess the Impact of Change Requests:
Before approving a change request, it is crucial to assess its impact on the project’s scope, timeline, and budget. This assessment should consider the potential risks, resource requirements, and dependencies associated with implementing the change request. By thoroughly evaluating the impact of change requests, the project team can make informed decisions and avoid any negative consequences that may arise from poorly managed changes.

4. Communicate Effectively:
Effective communication is key to managing change requests successfully. Project stakeholders should be kept informed about the change control process, the status of their change requests, and any decisions made regarding the requests. Regular communication channels, such as project meetings, status reports, and email updates, should be established to ensure that all stakeholders are on the same page. By maintaining open and transparent communication, the project team can build trust and manage change requests more effectively.

5. Document and Track Changes:
It is essential to document all change requests, including their details, reasons, and outcomes. This documentation serves as a historical record and provides a reference for future decision-making. Additionally, tracking changes allows the project team to monitor the progress of each change request, ensuring that they are implemented as planned. By documenting and tracking changes, the project team can maintain accountability and ensure that all stakeholders are aware of the changes made to the project specification.

6. Involve Stakeholders in the Decision-Making Process:
When evaluating and approving change requests, it is crucial to involve relevant stakeholders in the decision-making process. This ensures that all perspectives are considered, and decisions are made collectively. By involving stakeholders, the project team can gain valuable insights, mitigate resistance to change, and increase the chances of successful implementation. Collaboration and consensus-building are essential for managing change requests effectively.

7. Test and Validate Changes:
Before implementing approved changes, it is essential to test and validate them. This ensures that the changes do not introduce any unintended consequences or negatively impact the project’s functionality. Testing and validation should be conducted in a controlled environment, and the results should be documented. By thoroughly testing and validating changes, the project team can minimize the risks associated with change implementation.

Keywords: change requests, IT project, specification, change control process, prioritize, assess impact, communicate, document, track changes, involve stakeholders, test and validate.

Long-tail phrases: strategies for managing change requests during IT project specification development, effective change control process in IT projects, prioritizing change requests in IT projects, assessing the impact of change requests in IT projects, effective communication in managing change requests, documenting and tracking changes in IT projects, involving stakeholders in change request decision-making, testing and validating changes in IT projects.


 

The role of security and data protection in an IT project specification

Rola bezpieczeństwa i ochrony danych w specyfikacji projektu IT

W dzisiejszym cyfrowym świecie, gdzie technologia odgrywa kluczową rolę we wszystkich aspektach naszego życia, bezpieczeństwo i ochrona danych są niezwykle istotne. W szczególności, w projektach związanych z technologią informacyjną (IT), zapewnienie odpowiedniego poziomu bezpieczeństwa i ochrony danych jest niezbędne dla sukcesu projektu. W tym artykule omówimy rolę bezpieczeństwa i ochrony danych w specyfikacji projektu IT oraz przedstawimy kluczowe aspekty, które należy uwzględnić.

Pierwszym krokiem w zapewnieniu bezpieczeństwa i ochrony danych w projekcie IT jest dokładne zdefiniowanie wymagań dotyczących bezpieczeństwa. Specyfikacja projektu powinna zawierać jasne i precyzyjne wytyczne dotyczące tego, jakie środki bezpieczeństwa należy wdrożyć, aby chronić dane przed nieautoryzowanym dostępem, utratą lub uszkodzeniem. Wymagania te powinny uwzględniać zarówno aspekty fizyczne, jak i logiczne bezpieczeństwa.

Aspekty fizyczne bezpieczeństwa obejmują zabezpieczenia fizyczne, takie jak kontrola dostępu do pomieszczeń serwerowych, monitorowanie wideo, systemy alarmowe itp. Specyfikacja projektu powinna określać wymagania dotyczące tych zabezpieczeń, tak aby zapewnić odpowiedni poziom ochrony danych.

Aspekty logiczne bezpieczeństwa dotyczą zabezpieczeń na poziomie aplikacji i systemu. W specyfikacji projektu należy uwzględnić wymagania dotyczące autoryzacji i uwierzytelniania użytkowników, szyfrowania danych, zarządzania uprawnieniami dostępu, monitorowania działań użytkowników itp. Ważne jest również uwzględnienie wymagań dotyczących zabezpieczeń sieciowych, takich jak zapory ogniowe, systemy wykrywania intruzów itp.

Kolejnym istotnym aspektem bezpieczeństwa i ochrony danych jest zarządzanie ryzykiem. Specyfikacja projektu powinna zawierać plan zarządzania ryzykiem, który określa, jakie ryzyka mogą wystąpić w trakcie projektu i jakie środki zostaną podjęte w celu ich minimalizacji lub eliminacji. Plan ten powinien uwzględniać zarówno ryzyka techniczne, jak i ryzyka związane z czynnikami ludzkimi.

Ważnym elementem bezpieczeństwa i ochrony danych jest również audyt bezpieczeństwa. Specyfikacja projektu powinna określać wymagania dotyczące regularnych audytów bezpieczeństwa, które mają na celu sprawdzenie, czy zaimplementowane środki bezpieczeństwa są skuteczne i czy spełniają określone standardy. Audyty te powinny być przeprowadzane przez niezależne podmioty, które posiadają odpowiednie kwalifikacje i doświadczenie w dziedzinie bezpieczeństwa IT.

Wreszcie, należy pamiętać o znaczeniu szkoleń i świadomości w zakresie bezpieczeństwa dla pracowników. Specyfikacja projektu powinna zawierać wymagania dotyczące szkoleń z zakresu bezpieczeństwa, które mają na celu zwiększenie świadomości pracowników na temat zagrożeń związanych z bezpieczeństwem danych i sposobów ich minimalizacji. Szkolenia te powinny być regularne i dostosowane do specyfiki projektu.

Podsumowując, bezpieczeństwo i ochrona danych są nieodłącznymi elementami projektów IT. Specyfikacja projektu powinna uwzględniać wszystkie istotne aspekty bezpieczeństwa, takie jak zabezpieczenia fizyczne i logiczne, zarządzanie ryzykiem, audyt bezpieczeństwa oraz szkolenia pracowników. Tylko poprzez odpowiednie uwzględnienie tych aspektów można zapewnić odpowiedni poziom bezpieczeństwa i ochrony danych w projekcie IT.

Słowa kluczowe: bezpieczeństwo danych, ochrona danych, specyfikacja projektu IT, zabezpieczenia fizyczne, zabezpieczenia logiczne, zarządzanie ryzykiem, audyt bezpieczeństwa, szkolenia pracowników.

Frazy kluczowe: rola bezpieczeństwa i ochrony danych w projekcie IT, znaczenie bezpieczeństwa danych w specyfikacji projektu, aspekty bezpieczeństwa w projekcie IT, jak zapewnić bezpieczeństwo danych w projekcie IT, jak chronić dane w projekcie IT.


 

Techniques for conducting user acceptance testing in an IT project specification

There are several techniques that can be employed to conduct user acceptance testing effectively. These techniques help in ensuring that the testing process is thorough, efficient, and provides accurate results. Let’s explore some of these techniques in detail:

1. Test planning: Before conducting UAT, it is essential to have a well-defined test plan in place. This plan should outline the objectives, scope, and approach of the testing process. It should also include a list of test scenarios and test cases that will be executed during UAT. A comprehensive test plan helps in organizing the testing process and ensures that all necessary aspects are covered.

2. Test environment setup: Setting up the test environment is crucial for conducting UAT. The test environment should closely resemble the production environment to ensure accurate results. It should include all the necessary hardware, software, and network configurations required for testing. Creating a realistic test environment helps in simulating real-world scenarios and ensures that the system performs as expected in different conditions.

3. Test data preparation: Test data plays a vital role in UAT. It is essential to prepare relevant and realistic test data that represents the actual usage of the system. This includes creating test scenarios that cover different user interactions and input variations. Test data should be carefully selected to ensure that all functionalities and features of the system are thoroughly tested.

4. Test execution: During UAT, the test cases outlined in the test plan are executed. Testers simulate real-world scenarios and perform various actions to validate the system’s functionality. They also verify if the system meets the specified requirements and performs as expected. Test execution involves documenting any issues or bugs encountered during testing and reporting them to the development team for resolution.

5. Test documentation: Proper documentation is essential throughout the UAT process. Testers should maintain detailed records of the test scenarios, test cases, test data, and test results. This documentation helps in tracking the progress of testing, identifying any recurring issues, and ensuring that all requirements are met. It also serves as a reference for future testing or troubleshooting purposes.

6. Test feedback and validation: User feedback is a valuable asset during UAT. Testers should actively seek feedback from the end users to understand their experience with the system. This feedback helps in identifying any usability issues, performance bottlenecks, or areas of improvement. Testers should validate the feedback received and ensure that the necessary changes are incorporated into the system.

In conclusion, user acceptance testing is a critical phase in the development of an IT project. Employing effective techniques for conducting UAT ensures that the system meets the end user’s requirements and expectations. By following a well-defined test plan, setting up a realistic test environment, preparing relevant test data, executing test cases, documenting the process, and seeking user feedback, organizations can ensure the successful implementation of their IT projects.

Keywords: user acceptance testing, UAT, IT project, test planning, test environment setup, test data preparation, test execution, test documentation, test feedback, validation.

Long-tail phrases: techniques for conducting user acceptance testing, IT project specification, effective user acceptance testing techniques, test planning in UAT, test environment setup for UAT, test data preparation in UAT, executing test cases in UAT, documentation in UAT, user feedback in UAT, validation in UAT.


 

Strategies for managing project risks in an IT project specification

1. Identify and Assess Risks:
The first step in managing project risks is to identify and assess them. This involves conducting a thorough analysis of the project specification, identifying potential risks, and evaluating their potential impact on project objectives. Risks can range from technical challenges to resource constraints, stakeholder conflicts, or even external factors such as regulatory changes. By understanding the risks upfront, project managers can develop appropriate mitigation strategies.

2. Prioritize Risks:
Not all risks are created equal, and it is essential to prioritize them based on their potential impact and likelihood of occurrence. This can be done by assigning a risk rating or score to each identified risk. By focusing on high-priority risks, project managers can allocate resources and develop contingency plans accordingly. Prioritization ensures that efforts are directed towards managing risks that pose the greatest threat to project success.

3. Develop Risk Response Strategies:
Once risks are identified and prioritized, the next step is to develop risk response strategies. These strategies can be categorized into four main types: avoid, transfer, mitigate, or accept. Avoiding risks involves eliminating or changing project elements that pose a significant risk. Transferring risks involves shifting the responsibility to a third party, such as outsourcing a critical task. Mitigating risks involves implementing measures to reduce the likelihood or impact of a risk. Finally, accepting risks involves acknowledging that certain risks are unavoidable and developing contingency plans to minimize their impact.

4. Monitor and Control Risks:
Risk management is an ongoing process that requires continuous monitoring and control. Project managers should establish a robust risk monitoring system to track the progress of risk response strategies and identify any new risks that may arise during project execution. Regular risk assessments should be conducted to ensure that risk management efforts remain effective and aligned with project objectives. Additionally, project managers should communicate risk status and updates to stakeholders to maintain transparency and manage expectations.

5. Learn from Past Projects:
One of the most valuable sources of knowledge in managing project risks is past project experiences. By analyzing previous projects, project managers can identify common risks and develop best practices for risk management. Lessons learned from past projects can help in refining risk identification techniques, improving risk response strategies, and enhancing overall project performance. Organizations should encourage a culture of learning and knowledge sharing to leverage past experiences and continuously improve risk management practices.

Keywords: project risks, IT project specification, risk management, risk identification, risk assessment, risk prioritization, risk response strategies, risk monitoring, project execution, project success, lessons learned.

Long-tail phrases: , effective risk management in IT projects, prioritizing and mitigating risks in IT projects, best practices for risk management in IT projects, leveraging past experiences for risk management in IT projects.


 

Tips for creating a comprehensive training plan in an IT project specification

1. Identify the training needs: The first step in creating a training plan is to identify the specific training needs of the project. This can be done by conducting a thorough analysis of the project requirements, the skills and knowledge gaps of the team members, and the desired outcomes of the project. By understanding the training needs, you can tailor the plan to address those specific areas.

2. Set clear objectives: Once the training needs have been identified, it is important to set clear and measurable objectives for the training plan. These objectives should align with the overall goals of the project and should be specific, achievable, relevant, and time-bound. Clear objectives provide a roadmap for the training plan and help in evaluating its effectiveness.

3. Determine the training methods: There are various training methods available, such as classroom training, online courses, workshops, on-the-job training, and mentoring. It is essential to determine the most suitable training methods based on the project requirements, the learning styles of the team members, and the available resources. A combination of different training methods can be used to cater to the diverse needs of the team.

4. Develop a training schedule: A comprehensive training plan should include a well-defined training schedule. This schedule should outline the timeline for each training activity, including the start and end dates, the duration of each session, and the frequency of the training. It is important to consider the availability of the team members and any project deadlines while developing the training schedule.

5. Design the training content: The training content should be designed in a way that is engaging, relevant, and aligned with the project requirements. It should cover all the necessary topics and skills that the team members need to acquire. The content can include presentations, case studies, hands-on exercises, simulations, and assessments. It is important to ensure that the content is easily understandable and accessible to all team members.

6. Assign trainers or facilitators: Depending on the complexity of the training plan, it may be necessary to assign trainers or facilitators who have the expertise and experience in the specific areas of training. These trainers should be able to effectively deliver the training content, answer questions, provide guidance, and facilitate discussions. They should also be available to provide ongoing support to the team members throughout the training process.

7. Evaluate the training plan: Evaluation is a crucial step in creating a comprehensive training plan. It helps in assessing the effectiveness of the training activities and identifying any areas that need improvement. Evaluation can be done through assessments, feedback surveys, and performance reviews. The feedback received should be used to make necessary adjustments to the training plan and ensure its continuous improvement.

In conclusion, a comprehensive training plan is essential for the success of an IT project. By following these tips, organizations can create a training plan that addresses the specific needs of the project, sets clear objectives, utilizes appropriate training methods, and provides ongoing support and evaluation. Investing time and effort in creating a comprehensive training plan will ultimately lead to a more skilled and efficient team, resulting in the successful completion of the IT project.

Keywords: training plan, IT project, comprehensive, specification, training needs, objectives, training methods, training schedule, training content, trainers, evaluation.

Long-tail phrases: creating a comprehensive training plan in an IT project specification, tips for creating a comprehensive training plan, importance of a training plan in IT projects, identifying training needs in an IT project, setting objectives for a training plan, determining training methods in an IT project, developing a training schedule for an IT project, designing training content for an IT project, assigning trainers or facilitators in an IT project, evaluating a training plan in an IT project.

Specjalista ds pozycjonowania w CodeEngineers.com
Nazywam się Łukasz Woźniakiewicz, jestem właścicielem i CEO w Codeengineers.com, agencji marketingu internetowego oferującej między innymi takie usługi jak pozycjonowanie stron/sklepów internetowych, kampanie reklamowe Google Ads.

Jeśli interesują Cię tanie sponsorowane publikacje SEO bez pośredników - skontaktuj się z nami:

Tel. 505 008 289
Email: ceo@codeengineers.com
Łukasz Woźniakiewicz